The pressure to develop Oxford as a Fast Growth City is part of a bigger picture of growth due to consume acres of green spaces not only in Oxford and Oxfordshire, but also extending to large swathes of countryside on the Oxford Cambridge Arc, for which over 1 million new homes are planned.
Given the emergencies of climate and nature, the huge contribution construction and transport make to carbon emissions and the importance of our natural world for climate resilience, it is time to think again!
There are 3 consultations on the growth plans for Oxford, Oxfordshire and the Oxford Cambridge Arc:
Oxford 2040 Local Plan (closes 24th August)
Oxfordshire 2050 Plan (closes 8 October)
Oxford Cambridge Arc (closes 12 October)
Background information
Before completing the consultations, you might like to see the useful assessment and response guide to the consultations written by the Oxfordshire branch of the Campaign for the Protection of Rural England http://www.cpreoxon.org.uk/
and
CPRE’s report on brownfield sites here https://www.cpre.org.uk/resources/state-of-brownfield-2020/
Oxford 2040 Local Plan
The Oxford 2040 Local Plan sets out the growth for Oxford City over the next 20 yrs.
It will replace the current 2036 Local Plan in 2 years’ time. The scoping document is full of good intentions and is alert to the climate emergency and the changes resulting from COVID, but the actions are still for growth, with a view to attempting to ‘decouple growth from carbon emissions’.
The consultation has two parts, as questionnaire and a more in-depth survey on the principles behind the plan here. It closes on Tuesday August 24th
Oxfordshire 2050 Plan
The 2050 Plan for Oxfordshire is a growth agenda for over the next 30 yrs.
It sets out 3 levels of growth for Oxfordshire, Standard Level (102 000 houses) which is twice the 53 000 given by the Office of National Statistics as the actual need, Business as Usual (123 000 houses) and Transformational Growth (153 000 houses).
But it does not give any details of the risks and benefits of these proposals. Please see the CPRE summary here and you can respond to the consultation here.
Oxford Cambridge Arc Consultation
This is a government consultation on the plans for 1 million new jobs and houses with £163 billion increase in economic output.
The documents and consultation can be found here.
And further information from the environmental campaign group Stop the ARC sets out the social and environmental issues here.
